Scope
Construction works are include the upgrade of an existing paved road of 10.913 km (1.970 km
provincial road and 8.943 km Kabupaten road, Malaoge to SP I) which is in medium to poor condition,
upgrade approx. 4 km of existing gravel road which is medium to good condition (SP I to SP VI),
construction of approx 1.1 km new road (6 m width) which connect SP VI to wellsite.